Enreji-Su has taken place in the consortium that is constituted to construct Konaktepe Dam and Hydroelectric Power Plant on Munzur river, near Tunceli. Invetigation drillings and assembly of landslide measurement devices are handled successfully by Enerji-Su.
For the Auturia based Strabag company which is also a member of the consortium, core exploration drilling is fullfiled, on the energy tunnel rute.
Core exploration drilling operations that are carried out on very challenging land conditions, 2 diesel wire-line equipped D 260 type Crealius drilling machines are used.
Enreji-Su has taken place in the consortium that is constituted to construct Konaktepe Dam and Hydroelectric Power Plant on Munzur river, near Tunceli. Invetigation drillings and assembly of landslide measurement devices are handled successfully by Enerji-Su.
For the Auturia based Strabag company which is also a member of the consortium, core exploration drilling is fullfiled, on the energy tunnel rute.
Core exploration drilling operations that are carried out on very challenging land conditions, 2 diesel wire-line equipped D 260 type Crealius drilling machines are used.
DETAILS
- Job Provider Devler Su İşleri Müdürlüğü
- Location Tunceli - Ovacık - Konaktepe Barajı ve Hes
- Drill Type Karotlu
- Total Amount Of Work 3.000 m
- Start Date 01.01.2002
- Finish Date 01.01.2003