General Directorate Of State Hydraulic Works
EXPLANATİON
Adana - Seyhan Kavsak and Köprü Dams
ATA Construction has handeled the construction of Köprü and Kavsak Dams with the Build-Operation-Transfer model and Enerji-Su has carried out the necessary preliminary studies of the Project. During these works very important informations have been gathered for the project works by core drilling by an average of 250 m and a total of 5.000 m.
2 wire-line equipped Crealius 60 drilling machines are used in these operations in a site where natural conditions are very challenging and transportation is very difficult.
ATA Construction has handeled the construction of Köprü and Kavsak Dams with the Build-Operation-Transfer model and Enerji-Su has carried out the necessary preliminary studies of the Project. During these works very important informations have been gathered for the project works by core drilling by an average of 250 m and a total of 5.000 m.
2 wire-line equipped Crealius 60 drilling machines are used in these operations in a site where natural conditions are very challenging and transportation is very difficult.
DETAILS
- Job Provider Devler Su İşleri Müdürlüğü
- Location Adana - Seyhan Kavşak ve Köprü Barajları
- Drill Type Karotlu
- Total Amount Of Work 5.200 m
- Start Date 01.01.1998
- Finish Date 01.01.2000