General Directorate Of State Hydraulic Works
OTHER BUILDING SITE
-
- Job ProviderDevler Su İşleri Müdürlüğü
- LocationTunceli - Ovacık - Konaktepe Barajı ve Hes
- Drill TypeKarotlu
- Completed Drilling3.000 m
- Start Date01.01.2002
- Finish Date01.01.2003
For More İnformation Please Click.Konaktepe Dam
Enreji-Su has taken place in the consortium that is constituted to construct Konaktepe Dam and Hydroelectric Power Plant on Munzur river, near Tunceli. Invetigation drillings and assembly of landslide measurement devices are handled successfully by Enerji-Su.
For the Auturia based Strabag company which is also a member of the consortium, core exploration drilling is fullfiled, on the energy tunnel rute.
Core exploration drilling operations that are carried out on very challenging land conditions, 2 diesel wire-line equipped D 260 type Crealius drilling machines are used. -
- Job ProviderDevler Su İşleri Müdürlüğü
- LocationAdana - Seyhan Kavşak ve Köprü Barajları
- Drill TypeKarotlu
- Completed Drilling5.200 m
- Start Date01.01.1998
- Finish Date01.01.2000
For More İnformation Please Click.Adana - Seyhan Kavsak and Köprü Dams
ATA Construction has handeled the construction of Köprü and Kavsak Dams with the Build-Operation-Transfer model and Enerji-Su has carried out the necessary preliminary studies of the Project. During these works very important informations have been gathered for the project works by core drilling by an average of 250 m and a total of 5.000 m.
2 wire-line equipped Crealius 60 drilling machines are used in these operations in a site where natural conditions are very challenging and transportation is very difficult. -
- Job ProviderDevler Su İşleri Müdürlüğü
- LocationŞanlıurfa - Atatürk Barajı
- Drill TypeKarotlu ve Enjeksiyonlu
- Completed Drilling2.000.000 m
- Start Date01.01.1984
- Finish Date01.01.1994
For More İnformation Please Click.Atatürk Dam and Hydroelectric Power Plant Construction
In the geotechnic works of Atatürk Dam, 40 full hydrolic dirilling machines are used. The impermeability Wall (grout curtain) that is formed by a total of around 2 million meters of drilling and 200.000 tons of cement injection, is one of the world’s greatest drilling and injection operatons in a single construction site.
During the construction of grout curtain which is placed in layer that consists of sinkhole limestones and sinkhole dolomites, the crew came upon against over 50 meter depth sinkhole caves and used special injection techniques to fill them.
Ataürk Dam’s grout curtain which is 1,2 square meter wide, is completed in short time period of 6 years. The maximum depth of the grouting curtain is 300 meters and its average depth is about 200 meters.
Nearly all of the injection operations were executed in galleries of totally 12.471 meters long.
D 260 drill rig with short boom and special-purpose produced drilling machines adequate for narrow drainage galleries of Hydroelectric Power Plant, were used to drill inside the galleries having dimensions of 2.00 x 2.20 m, which are very difficult to be drilled. A total of 50.000 meters of drilling was executed by using special-purpose produced 0.75 m tie-rods.
Monthly drilling amount went up to 50.000 meters, during the construction of grouting curtain, only inside the main curtain.
6.700 VSL type post-tension rock anchores in different dimensions and having a capacity around 440 tons and lengths reaching 30 meters, were applied by usig cables up to 17 strands fort he spillway stilling basen on the dam. To assemble these anchores totally 125.000 meters of drilling was executed with a diameter of 150 mm and a depth of 30 m. In anchor borings, a very fast production has been provided by using WITH BO type boring machines and DTH Hammers.