Jordan Deadsea Coast
DETAILS
- Job Provider Arab Potash Company
- Location Jordan Deadsea Coast
- Total Amount Of Work 5.000 meter Core and Special Instrumentation Drilling
- Start Date 01.01.1996
- Finish Date 01.01.2000
EXPLANATİON
Countless dirilling operations are completed in the Deadsea coast of Jordan, for the construction of 2 barriers having a total length of over 20 km. These barriers are constructed in order to develop evaporation and consentration pools in potas plants. In these drilling operations that are made to asseble measuring devices, 2 WIRTH BO drilling machines are used.
Because of the unconsolidated mud floor or massive salt layers, very special drilling techniques are used in these operations, to obtain carrot and samples appropriate fort this kind of terrain conditions.
Because of the unconsolidated mud floor or massive salt layers, very special drilling techniques are used in these operations, to obtain carrot and samples appropriate fort this kind of terrain conditions.